Located 8 kilometers off the eastern coast of Dongying City in Shandong Province, the project covers an area of approximately 1,223 hectares with a total installed capacity of 1 gigawatt. This globally pioneering initiative features 2,934 PV platforms installed using large-scale offshore steel truss platform fixed pile foundations. Each platform measures 60 meters in length and 35 meters in width. Notably, this project marks the first time in China that a 66-kilovolt offshore cable paired with an onshore cable has been used for high-capacity, long-distance transmission in the PV sector.
Upon completion, the project is expected to generate 1.78 billion kilowatt-hours of power annually, enough to meet the needs of approximately 2.67 million urban residents in China. This is equivalent to saving an estimated 503,800 tons of standard coal and reducing carbon dioxide emissions by 1.3447 million tons. Additionally, the project utilizes an integrated fishing and PV development model, combining fish farming with PV power generation to enhance the comprehensive utilization of the marine area.
Source: CHN Energy
Also interesting:
- Company News22/10/2024EDP's second utility-scale solar PV project in Italy, “Campo Agrosolare Tuscia 15,” marks a key milestone in the company’s mission to diversify renewable energy ...
- Press release, Expert knowledge22/10/2024According to a report by the Rocky Mountain Institute, the Global South is adopting cleantech faster than the Global North and is increasingly focussing on ...